Ask questions about installing and configuring ProcessMaker 3
By azatrath
#815681
i was trying to upgrade processmaker 3.2.1. to 3.2.3. and i get this failure. i searched your wikia and forum nobody gets same problem i think.
i didnt change my pmos.conf file.
Attachments
Ekran Alıntısı.PNG
Ekran Alıntısı.PNG (32.23 KiB) Viewed 4557 times
User avatar
By amosbatto
#815692
I was told yesterday that you have to first upgrade from PM 3.2.1 to PM 3.2.2. Then, upgrade from 3.2.2 to 3.2.3.

I recommend overwriting your PM 3.2.3 code with PM 3.2.2 code and then run the processmaker upgrade command. Then, you can try upgrading to PM 3.2.3.
By azatrath
#815856
amosbatto wrote: Tue Aug 14, 2018 11:40 pm I was told yesterday that you have to first upgrade from PM 3.2.1 to PM 3.2.2. Then, upgrade from 3.2.2 to 3.2.3.

I recommend overwriting your PM 3.2.3 code with PM 3.2.2 code and then run the processmaker upgrade command. Then, you can try upgrading to PM 3.2.3.
so you are telling me upgrade PM 3.2.2 and then go for 3.2.3. i want to ask something. İf something goes wrong what can i do? we need all of this datas.
User avatar
By amosbatto
#815861
OK, let's go through the basics. If you have a Linux system, did you reapply the file permissions? If you tried to upgrade a Bitnami installation, then it will never work.

Did you make a backup of your database and the ProcessMaker files before you tried to upgrade from 3.2.1 to 3.2.3?
If you did that, then you should restore everything to PM 3.2.1.

If you exported your workspace before trying to upgrade, then you can reinstall ProcessMaker 3.2.1 and then import your workspace.

If you don't have a backup and you have critical data that you can't loose, then I recommend that you call ProcessMaker and ask for their help.

In the rapidly evolving world of online sports be[…]

STEPN integrates social networking and games that […]

Cenforce 150 is a medication used to cope with a c[…]

What's SAP FICO?

Trustworthy and skill-building, each of these actu[…]