ProcessMaker news, events, releases, and updates
By nshong
#11997
I installed PM version 2.0.8, I found that below problem.
1) no start date, transfer date and end date in case history.
2) date delegation time was 00:00:00 all the time in advance search listing.
3) due date time was 00:00:00 all the time in Inbox , Draft listing.
4) sent by in all the listing unable to see the sender name.

The data in database was correct. It recorded the datetime correctly.
Attachments
pm-sentby.jpg
pm-sentby.jpg (37.52 KiB) Viewed 129615 times
pm-dateempty.jpg
pm-dateempty.jpg (48.15 KiB) Viewed 129615 times
pm-datenotime.jpg
pm-datenotime.jpg (110.45 KiB) Viewed 129615 times
#12363
Hi eethore,
PM generally doesn't provide patches (except in certain cases for paying clients with support plans). Keep watching the bug report until it gets fixed, then do an upgrade to the new version which fixes this problem.
By nshong
#12855
I upgrade version 2.0.8 to 2.0.23, some of the date problem are solved but still left one date problem not solve.
Here i attach the picture to show you. Every time I change the date format in environment setting, the red rectangle date will not change .
Attachments
pm-datenotime3.jpg
pm-datenotime3.jpg (53.02 KiB) Viewed 129418 times

A 1xbet clone script is a pre-designed software so[…]

4rabet clone script is enabling entrepreneurs to e[…]

Parimatch clone script is enabling entrepreneurs t[…]

In the world of cryptocurrency, a wallet is an app[…]